Part 1: The stalls
The first project was to change the lower part of the bank barn back into stalls as it was being used as a bedroom.
Wall removal
Large sink removal
There was a lot of insulation to be taken out
Getting closer...John removed this
plywood floor so he could install a crushed stone floor
Packing the dumpster full of floor/wall/insulation material!

A few weeks later John's friend came and helped build stall walls and also install a new beam, Thank you Harry!!
Frosty's stall
Speck's stall
Old doors with new hardware
No comments:
Post a Comment